Wednesday, December 28, 2011

We started painting today!!!



It's almost time for New Year's Eve celebrations and we are so close to being finished with our renos n onto moving back in and decorating :p

We started with painting the skirting today :)

I was annoyingly very sick :( so made it through an hour or so of work before I was in so much pain I was almost begging to go home to bed :( not sure exactly what's wrong with me but fingers
crossed..... it's something I ate?

This has been a tough 6 months but now that we are near the end it's all worth it. We have made it through the storm! We still have some $$$ lol..... "some" can mean different things to different people..... I wish it meant more to me!

I can't thank Chris enough for being such a captain!!! of our ship on our expedition. He really has been so strong and proactive we really wouldn't be where we are today if it weren't for him!

AND my dad! My wonderful dad, fireman, builder, the best dad ever. I always thought dad would be the brains! the know-how! tell etc etc to do etc etc BUT he has done it all!!! He has been there more than anyone. Calculating and putting together the puzzle that is our new home. He has done as much of it as he can himself with the help of a handful of tradies/specialists.

The rest of the skirtings/house to paint tomoz! nite nite xx

Sunday, June 26, 2011

Demo has begun

Demo work has finally started this week - it's great to see progress getting made.
Hopefully next week we will be ready to lay the new concrete slab.
Heres a photo Kylie took of myself, Steve and Andrew. More pics to come :)


Thursday, April 7, 2011

Glacier pace

Not post in a while - thats because not much has happened really. We should have all documents the Certifier needs to start the construction process by end of next week - just waiting on a document from the building designer showing DA condition references and a document from the engineer stating structural stability of existing party walls. Hopefully start to demo start of next month! In other DA news - the council has requested a landscape plan by a qualified landscape designer, a swept path analysis and amended roof plans to minimise neighbour over shadowing. The proposed studio above garage blocked out too much light apparently. So far ive organised a landscaper to start on a design, had a swept path analysis done and will discuss on weekend with builder as to best garage attic roof option. Should get all this back to council in 2 to 3 weeks’ time- then council can assess the DA

So we should have all documents the Certifier needs to start the construction process by end of next week - just waiting on a document from the building designer showing DA condition references and a document from the engineer stating structural stability of existing party walls. Hopefully start to demo start of next month!



In other DA news - the council has requested a landscape plan by a qualified landscape designer, a swept path analysis and amended roof plans to minimise neighbour over shadowing. The proposed studio above garage blocked out too much light apparently.



So far ive organised a landscaper to start on a design, had a swept path analysis done and will discuss on weekend with builder as to best garage attic roof option.



Should get all this back to council in 2 to 3 weeks’ time- then council can assess the DA